For this assignment we had 6 weeks to create a BBC 2 Ident in groups. To do this me, Molly, Sammy, Tisha and Danie had to do our own roles. Unfortunately not everyone participated in their own roles. Molly and me both came into college on our days of to finish making the number two so that it was ready for the upcoming wednesday so that we could re-shoot. Molly's part to play was team leader and i was the editor, although these were our roles we both took on everyone else's roles. Molly and i both did session were we filmed on our own, we both found out that it was a lot of effort that needed to go into creating this Ident, and at times it did seem like the pair of us were doing all the work.
Sammy's job was to be the prop designer, however all she just recorded me and Molly creating the number 2.
When it came to shooting the video, we were issued with a small flip camera, and a cambo camera stand, lights, a table, skittles, a cloth, and then number 2 which was created. The reason why we shot in the studio was because we thought that it was the best place to shoot, also it gave out the right amount of light that we needed. Also that if we needed to change the lighting it would be quick and easy to move.
We developed our ideas from the first week. We all thought that dropping the number 2 into a pile of skittles would give a nice and colorful effect when the skittles when flying in to different directions. Throughout the weeks we were experimenting using different props, setting the camera at different angles and messing around with the lights to see which clip came out best.
Once we had found out what was best for us to shoot the video, we went out and brought 5 bags of skittles (spilt the money equally). We found out that doing a test shoot we would need around 4/5 bags to give it the effect we wanted. Once we had done this me and Molly then started to create the number 2. We both took it in turns to cut out a number 2 because it was quite difficult and hurt our hands. We both created the number two in college by using foam board, paper mashe, newspaper and paint. Molly and I both came in on a Friday to paper mashe the number two so that it was ready for Monday so that we could do the back and then start to paint it. We used 3 layers of paint and after each layer we went into the toilet and used the hand dryer to dry it so that is was quicker. We completed the number 2 by the end of Monday so that it was ready for Wednesday when we were re mashe-shooting. When me and Molly were paper mache and painting the number 2 the rest of the team members didn't offer to participate!
During us making the number 2 sammy filmed little sections of us making the number 2.
After doing all of this me and Molly went into the studio to re-shoot. After doing this we downloaded it to the computer, and then started to edit.
Overall, i am quite happy with the finished outcome. However some of the group members could have participated a bit more.